top of page
Search
Writer's pictureLisa Worthington

When do I need planning permission?

Updated: Jul 21, 2021




When Do I Need Planning Permission?

The question "Do I need planning permission?" is probably the first one people ask when they are looking to extend or re model their property or workspace. Worthington Architectural Design can walk you through all the rules and regulations regarding whether you will need planning permission as part of the process of creating your architectural design vision. We can help you change the way you live & work, taking you through the complexities of the planning process.

If, however you need some immediate guidance, refer to our quick reference guide below:

You WILL definitely need planning permission if:


  1. Your property in a conservation areas

  2. Your property is a listed building

  3. Your property is in an Area of Outstanding Natural Beauty (AONB)

If your property does not fall into any of the 3 categories list above, you may still need to apply for planning permission as a result of the type of modifications / extensions you are looking to add to your property.

Government Planning Portal Guidance for Planning Permission

Please refer to the Planning Portal for more detail or call us to talk through your initial ideas and we will be able to advise you on the next steps.

You May Just Need Prior Approval Instead of Planning Permission

It may transpire that you will only need Prior Approval rather than Planning Permission and a phone call to us will give you a clearer picture.



Government Guidance on Prior Approval

Notification and prior approval process Government has introduced a £96 fee for this process that applies to all applications from 19 August 2019 onwards .

You can claim an exemption to this fee if:

• The proposal is for extensions and alterations to a disabled person's dwelling house to improve access, safety, comfort, etc ; or

• An application for planning permission (for which a fee is payable) is being made by the same applicant on the same date for the same site, buildings or land as the prior approval application.

1. A homeowner wishing to build a larger single-storey rear extension must apply to the local planning authority, providing : a. a written description of the proposal which includes the length that the extension extends beyond the rear wall of the original house, the height at the eaves and the height at the highest point of the extension b. a plan of the site, showing the proposed development and any existing enlargement of the original house that the proposals will join to. c. the addresses of any adjoining properties (this should include any premises to the side/front/rear, even if they are not physically 'attached'). d. a contact address for the applicant (the householder) and an email address if they want to receive correspondence by email. A plan drawn to an identified scale will assist the authority in assessing your development proposal. Plans can be bought from one of our accredited suppliers using our ‘Buy a planning map’ service.

The information provided should include all the details necessary for the Local Authority to determine if the proposal complies with permitted development legislation, and if its prior approval will be required. If sufficient information is not provided the Local Authority can either request it, or refuse the application.

2. The local authority will serve a notice on adjoining owners or occupiers, i.e. those who share a boundary, including to the rear. This will give the address of the proposed development and describe it, including the information in 1(a) above. A copy of this notice will also be sent to the developer. Planning Portal Application Guidance V2019 It will also set out: a. when the application was received, and when the 42- day determination period ends b. how long neighbours have to make objections (which must be a minimum of 21 days), and the date by which these must be received 3. If any adjoining neighbour raises an objection within the 21-day period, the prior approval of the local authority will be required to determine if the proposal’s impact on the amenity of all adjoining properties is acceptable. 4. The development can go ahead if the local authority notifies the developer in writing either: a. that as no objections were received from adjoining neighbours, it’s prior approval is not required, or b. that, following consideration, it has determined that the effect on the amenity of adjoining properties is acceptable Please note: All the other restrictions and eligibility criteria on permitted development for extensions continue to apply. See further details on the Planning Portal. 5. If the local authority does not notify the developer of its decision within the 42- day determination period, the development may go ahead. 6. If approval is refused, the developer may appeal. 7. The extension must be built in accordance with the details approved by the local authority (or, if no objections were raised or the local authority has not notified the developer of its decision, the details submitted), unless the local authority agrees any changes in writing. 8. The development must accord with all other relevant limitations and conditions which apply to other rear extensions allowed under permitted development.

These are set out in Class A, and include for example, the requirement that the extension must be constructed using materials of a similar appearance to those used in the construction of the rest of the house. See further details on the Planning Portal.

63 views0 comments

Comments


bottom of page